If You Have an Automatic Optical Inspection (AOI) Machine Connected to the Internet, Here’s How We Can Help
Board Capture
An operator places the PCB for inspection. This takes 5 to 10 minutes, with actions like rotating the board and adjusting the setup.
Program Creation
Once captured, we remotely program the machine for the PCB’s inspection needs based on the design.
Program Optimization
The program is tested, adjusted for precision, and optimized for each specific PCB.
Testing
The operator manually places the board for testing while we monitor results and adjust libraries.
End Result
At VK Engineering, we create remote inspection programs, ensuring efficiency and precision while reducing operator involvement.
Our Process Includes:
- Board Capture: Initial inspection setup.
- Program Creation: Remote programming for inspection.
- Program Optimization: Adjustments for precise measurements.
- Testing: Manual board placement and result monitoring.